In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 26, 2026 - 03:30 UTC
Scheduled - We will be deploying updates to Batch Communication Engine as part of the 26.3.4 rollout. This update introduces various application bug fixes.
Aug 26, 202603:30-09:30 UTC
DATA IN
Operational
90 days ago
100.0
% uptime
Today
CSG S1 01 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 02 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S5 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US West (Oregon)
Operational
90 days ago
100.0
% uptime
Today
PROFILING
Operational
90 days ago
100.0
% uptime
Today
CSG S1 01 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 02 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S5 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US West (Oregon)
Operational
90 days ago
100.0
% uptime
Today
JOURNEY ORCHESTRATION
Operational
90 days ago
100.0
% uptime
Today
CSG S1 01 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 02 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S5 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US West (Oregon)
Operational
90 days ago
100.0
% uptime
Today
COMMUNICATIONS
Operational
90 days ago
100.0
% uptime
Today
CX Channels - SMS - Omaha Data Center 1
Operational
90 days ago
100.0
% uptime
Today
CX Channels - SMS - Omaha Data Center 2
Operational
90 days ago
100.0
% uptime
Today
CX Channels - SMS - Azure East US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - SMS - Azure West US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - MMS - Omaha Data Center 1
Operational
90 days ago
100.0
% uptime
Today
CX Channels - MMS - Omaha Data Center 2
Operational
90 days ago
100.0
% uptime
Today
CX Channels - MMS - Azure East US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - MMS - Azure West US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Voice - Omaha Data Center 1
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Voice - Omaha Data Center 2
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Voice - Azure East US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Voice - Azure West US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - RCS - Omaha Data Center 1
Operational
90 days ago
100.0
% uptime
Today
CX Channels - RCS - Omaha Data Center 2
Operational
90 days ago
100.0
% uptime
Today
CX Channels - RCS - Azure East US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - RCS - Azure West US
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Email - AWS US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Email - AWS EU Central (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CX Channels - Email - Omaha Data Center 1
Operational
90 days ago
100.0
% uptime
Today
ANALYTICS
Operational
90 days ago
100.0
% uptime
Today
CSG S1 01 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 02 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S5 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US West (Oregon)
Operational
90 days ago
100.0
% uptime
Today
DATA OUT
Operational
90 days ago
100.0
% uptime
Today
CSG S1 01 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 02 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - Europe (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
CSG S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
CSG S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S2 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S3 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S4 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S5 - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
KW S1 - US West (Oregon)
Operational
90 days ago
100.0
% uptime
Today
PREMIUM EXPERIENCE APPLICATIONS
Under Maintenance
90 days ago
100.0
% uptime
Today
Batch Commuincations Engine - US East (N. Virginia)
Under Maintenance
90 days ago
100.0
% uptime
Today
Bill Explainer Microsite API - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
Bill Explainer Studio - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
Payment Reminder Microsite API - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
Payment Reminder Studio - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
Xponent Communications Control - US East (N. Virginia)
Operational
90 days ago
100.0
% uptime
Today
Xponent Communications Control - AWS EU Central (Frankfurt)
Operational
90 days ago
100.0
% uptime
Today
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Major outage
Partial outage
No downtime recorded on this day.
No data exists for this day.
had a major outage.
had a partial outage.
Related
No incidents or maintenance related to this downtime.
Planned Date: Start: 08/26/2026 05:00:00 AM UTC End: 08/26/2026 11:00:00 AM UTC
Summary: CSG Xponent Voice and Messaging applications will undergo scheduled maintenance, which will impact components "Voice/Prod/OD2".
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
If you notice any unexpected behavior, please contact CSG’s Global Service Desk team via the MyCSG Support portal here: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region. Posted on
Aug 14, 2026 - 12:48 UTC
Scheduled -
Planned Date: Start: 26 August 2026, 05:00 UTC End: 26 August 2026, 07:00 UTC
Summary: Xponent will undergo planned maintenance to upgrade the underlying Aurora MySQL database engine from version 3.08.2 to version 3.10.3 for the Xponent Core (JO) customer databases in the CSG US East (N. Virginia) environment.
AWS is retiring the current Aurora MySQL engine version. Any cluster that remains on this version after 31 August 2026 will be upgraded automatically by AWS according to its schedule, rather than ours. To keep the upgrade under our control, communicate it in advance and remain aligned with supported technology standards, we plan to upgrade all applicable Aurora MySQL clusters by 27 August 2026, ahead of the AWS deadline.
The upgrade will be carried out using an AWS Managed Blue/Green Deployment. A synchronized copy of each database is upgraded in the background and then promoted, which keeps the change controlled and reversible.
What Does This Mean for You? • This is a zero-downtime upgrade. The Xponent Journey Hub will remain available throughout the maintenance window, and you will be able to log in and make configuration changes as normal. • Deployed graphs, real-time API listeners, and live integrations will continue to run normally throughout the switchover, with database connections re-established automatically. • This is a minor version upgrade, so it introduces no backwards-incompatible database changes. Database endpoints do not change, and no connector, integration or configuration updates are required on your side. • All existing data remains unchanged.
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
Following the upgrade, we will carry out our standard post-upgrade checks to ensure the platform is operating as expected. As with all Xponent Core (JO) upgrades, appropriate contingency and rollback measures are in place.
No action is required from you at this time.
If you notice any unexpected behaviour, please contact CSG's Global Service Desk via the MyCSG Support portal: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region.
Aug 21, 2026 - 21:53 UTC
Planned Date: Start: 27 August 2026, 05:00 UTC End: 27 August 2026, 07:00 UTC
Summary: Xponent will undergo planned maintenance to upgrade the underlying Aurora MySQL database engine from version 3.08.2 to version 3.10.3 for the Xponent Core (JO) customer databases in the CSG US East (N. Virginia) environment.
AWS is retiring the current Aurora MySQL engine version. Any cluster that remains on this version after 31 August 2026 will be upgraded automatically by AWS according to its schedule, rather than ours. To keep the upgrade under our control, communicate it in advance and remain aligned with supported technology standards, we plan to upgrade all applicable Aurora MySQL clusters by 27 August 2026, ahead of the AWS deadline.
The upgrade will be carried out using an AWS Managed Blue/Green Deployment. A synchronized copy of each database is upgraded in the background and then promoted, which keeps the change controlled and reversible.
What Does This Mean for You? • This is a zero-downtime upgrade. The Xponent Journey Hub will remain available throughout the maintenance window, and you will be able to log in and make configuration changes as normal. • Deployed graphs, real-time API listeners, and live integrations will continue to run normally throughout the switchover, with database connections re-established automatically. • This is a minor version upgrade, so it introduces no backwards-incompatible database changes. Database endpoints do not change, and no connector, integration or configuration updates are required on your side. • All existing data remains unchanged.
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
Following the upgrade, we will carry out our standard post-upgrade checks to ensure the platform is operating as expected. As with all Xponent Core (JO) upgrades, appropriate contingency and rollback measures are in place.
No action is required from you at this time.
If you notice any unexpected behaviour, please contact CSG's Global Service Desk via the MyCSG Support portal: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region. Posted on
Aug 21, 2026 - 21:54 UTC
Past Incidents
Aug 26, 2026
Unresolved incident: Batch Communication Engine PROD Release 26.3.4.
Completed -
The scheduled maintenance has been completed.
Aug 25, 07:00 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 25, 05:00 UTC
Scheduled -
Planned Date: Start: 25 August 2026, 05:00 UTC End: 25 August 2026, 07:00 UTC
Summary: Xponent will undergo planned maintenance to upgrade the underlying Aurora MySQL database engine from version 3.08.2 to version 3.10.3 for the Xponent Core (JO) customer databases in the Kitewheel US West (Oregon) environment.
AWS is retiring the current Aurora MySQL engine version. Any cluster that remains on this version after 31 August 2026 will be upgraded automatically by AWS according to its schedule, rather than ours. To keep the upgrade under our control, communicate it in advance and remain aligned with supported technology standards, we plan to upgrade all applicable Aurora MySQL clusters by 27 August 2026, ahead of the AWS deadline.
The upgrade will be carried out using an AWS Managed Blue/Green Deployment. A synchronized copy of each database is upgraded in the background and then promoted, which keeps the change controlled and reversible.
What Does This Mean for You? • This is a zero-downtime upgrade. The Xponent Journey Hub will remain available throughout the maintenance window, and you will be able to log in and make configuration changes as normal. • Deployed graphs, real-time API listeners, and live integrations will continue to run normally throughout the switchover, with database connections re-established automatically. • This is a minor version upgrade, so it introduces no backwards-incompatible database changes. Database endpoints do not change, and no connector, integration or configuration updates are required on your side. • All existing data remains unchanged.
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
Following the upgrade, we will carry out our standard post-upgrade checks to ensure the platform is operating as expected. As with all Xponent Core (JO) upgrades, appropriate contingency and rollback measures are in place.
No action is required from you at this time.
If you notice any unexpected behaviour, please contact CSG's Global Service Desk via the MyCSG Support portal: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region.
Aug 21, 21:52 UTC
Completed -
The scheduled maintenance has been completed.
Aug 24, 08:00 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 24, 05:00 UTC
Scheduled -
Planned Date: Start: 24 August 2026, 05:00 UTC End: 24 August 2026, 08:00 UTC
Summary: Xponent will undergo planned maintenance to upgrade the underlying Aurora MySQL database engine from version 3.08.2 to version 3.10.3 for the Xponent Core (JO) customer databases in the Kitewheel US East (N. Virginia) environment.
AWS is retiring the current Aurora MySQL engine version. Any cluster that remains on this version after 31 August 2026 will be upgraded automatically by AWS according to its schedule, rather than ours. To keep the upgrade under our control, communicate it in advance and remain aligned with supported technology standards, we plan to upgrade all applicable Aurora MySQL clusters by 27 August 2026, ahead of the AWS deadline.
The upgrade will be carried out using an AWS Managed Blue/Green Deployment. A synchronized copy of each database is upgraded in the background and then promoted, which keeps the change controlled and reversible.
What Does This Mean for You? • This is a zero-downtime upgrade. The Xponent Journey Hub will remain available throughout the maintenance window, and you will be able to log in and make configuration changes as normal. • Deployed graphs, real-time API listeners, and live integrations will continue to run normally throughout the switchover, with database connections re-established automatically. • This is a minor version upgrade, so it introduces no backwards-incompatible database changes. Database endpoints do not change, and no connector, integration or configuration updates are required on your side. • All existing data remains unchanged.
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
Following the upgrade, we will carry out our standard post-upgrade checks to ensure the platform is operating as expected. As with all Xponent Core (JO) upgrades, appropriate contingency and rollback measures are in place.
No action is required from you at this time.
If you notice any unexpected behaviour, please contact CSG's Global Service Desk via the MyCSG Support portal: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region.
Aug 21, 21:51 UTC
Completed -
The scheduled maintenance has been completed.
Aug 20, 07:00 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 20, 05:00 UTC
Scheduled -
Planned Date: Start: 08/20/2026 05:00:00 AM UTC End: 08/20/2026 07:00:00 AM UTC
Summary: CSG Xponent Voice and Messaging applications will undergo scheduled maintenance, which will impact components "Voice/Prod/ODC/OD2".
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
If you notice any unexpected behavior, please contact CSG’s Global Service Desk team via the MyCSG Support portal here: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region.
Aug 14, 12:45 UTC
Completed -
The scheduled maintenance has been completed.
Aug 19, 07:00 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 19, 05:00 UTC
Scheduled -
Planned Date: Start: 08/19/2026 05:00:00 AM UTC End: 08/19/2026 07:00:00 AM UTC
Summary: CSG Xponent Voice and Messaging applications will undergo scheduled maintenance, which will impact components "Voice/Prod/ODC".
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
If you notice any unexpected behavior, please contact CSG’s Global Service Desk team via the MyCSG Support portal here: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region.
Aug 14, 12:41 UTC
Completed -
The scheduled maintenance has been completed.
Aug 18, 07:00 UTC
In progress -
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 18, 05:00 UTC
Scheduled -
Planned Date: Start: 08/18/2026 05:00:00 AM UTC End: 08/18/2026 07:00:00 AM UTC
Summary: CSG Xponent Voice and Messaging applications will undergo scheduled maintenance, which will impact components "Voice/Prod/OD2".
Next Steps: As we make progress during the maintenance window, we will provide updates. Once the upgrade is complete, all affected components will be marked as complete.
If you notice any unexpected behavior, please contact CSG’s Global Service Desk team via the MyCSG Support portal here: https://www.csgi.com/mycsgcustomer-support/ or call the phone number listed at the bottom of the page for your region.
Aug 14, 12:39 UTC